logo
Quality Fast Replacement Boiler Header Spare Assembly Boiler Spare Parts CNC Deep-Hole factory
<
Quality Fast Replacement Boiler Header Spare Assembly Boiler Spare Parts CNC Deep-Hole factory
>

Fast Replacement Boiler Header Spare Assembly Boiler Spare Parts CNC Deep-Hole

Brand Name: Boyu
Place of Origin: China
Certification: ISO9001:2015, ISO14001:2015, ISO45001:2018
Minimum Order Quantity: 1 Set
Price: USD 5,000-50,000 / Set
Supply Ability: 10,000 MT per Month
Delivery Time: 30-60 working days after deposit
Payment Terms: T/T,L/C at sight
Standard Packaging: Seaworthy packing in fumigation-free wooden cases with anti-rust protection film and desiccant

Product Details


Product Name: Boiler Spare Parts Feature: Replacement
Material: Alloy Steel Name: Boiler Header Spare Assembly
Drilling Accuracy: +/-0.5mm Hole Position Tolerance Applicable Components: Economizer / Superheater / Reheater / Water Wall / Evaporator
Highlight

Fast Replacement Boiler parts

,

OEM Boiler Header Spare Assembly Boiler parts

,

CNC Boiler Spare Parts

Product Description

Boiler Header Spare Assembly for Fast Replacement with CNC Deep-Hole Drilling and Full Penetration Welding

 

The Boiler Header Spare Assembly is a critical pressure-bearing replacement component designed for maintenance and emergency replacement of damaged or end-of-life boiler headers in industrial and utility boilers. Engineered with precision and urgency in mind, this header serves the primary function of collecting and distributing working fluid between heating surface systems, and its reliable operation is fundamental to boiler safety and performance. As boiler headers approach their design service life or suffer from creep damage, corrosion or weld failures, the prefabricated spare header has become an indispensable element in modern boiler maintenance strategy, enabling direct replacement without lengthy on-site fabrication.

The Boiler Header Spare Assembly is specifically constructed to match the original equipment's dimensions, nozzle arrangement, material specification and pressure rating, ensuring direct compatibility and interchangeability. Fabricated from thick-wall seamless steel pipe (OD 159-426mm, WT 16-50mm), the spare header undergoes CNC deep-hole drilling with hole position tolerance of +/-0.5mm to replicate the original nozzle layout precisely. Material selection follows the operating temperature profile: 20G (SA-106 Gr.B) carbon steel for saturated and low-temperature zones (up to 460C), 15CrMoG (SA-335 P12) alloy steel for medium-temperature zones (480-520C), and 12Cr1MoVG (reference SA-335 P11/P22) for high-temperature zones (520-565C). Full-penetration nozzle welding ensures reliable joint integrity between the header body and connecting tubes.

Manufactured using certified thick-wall seamless pipe with CNC deep-hole drilling, automatic robotic nozzle welding and post-weld heat treatment, every Header Spare Assembly undergoes 100% ultrasonic testing (UT) of the header body and all weld joints, along with hydraulic pressure testing at 1.5 times design pressure. Complete material certification (MTC per heat number), welding procedure records (WPS/PQR), heat treatment reports and NDT documentation are provided for every header to support third-party inspection and boiler re-certification. ASME S-Stamp and U-Stamp certification ensures compliance with ASME BPVC Section I and Section VIII requirements. Boyu's production capacity enables delivery of spare headers within 20-40 days, with expedited options for critical situations.

One significant advantage of the prefabricated Header Spare Assembly is its contribution to reducing boiler downtime during major maintenance. Header replacement is one of the most time-consuming boiler maintenance tasks due to the precision required for nozzle alignment and welding. By delivering a fully fabricated, NDT-tested header with pre-machined nozzle openings and pre-welded end caps, on-site installation time is reduced by 50-70% compared with field fabrication. This directly translates to shorter boiler outages and faster return to service. Additionally, shop-controlled fabrication ensures consistent weld quality and dimensional accuracy that is difficult to achieve in field conditions, reducing the risk of post-installation leaks.

The Boiler Header Spare Assembly is adaptable to various boiler types, capacities and system locations, making it suitable for a wide range of industries including power generation, coking, petrochemical, steelmaking and large industrial steam generation. Its versatility enables replacement of superheater headers, reheater headers, economizer headers and water wall headers across all boiler pressure grades from low pressure (1.6MPa) to supercritical (25.4MPa, header pressure up to 29.3MPa at economizer inlet). Furthermore, the header can be customized to match specific OEM designs, including non-standard nozzle patterns, branch connections and instrument tap locations, ensuring optimal compatibility with existing boiler piping.

In addition to functional benefits, the Header Spare Assembly is designed with safety and long-term reliability in mind. All materials and fabrication methods comply with the most stringent international standards including ASME BPVC Section I, GB/T 16507 and IBR, ensuring safe operation under high-pressure, high-temperature conditions. Post-weld heat treatment is mandatory for all alloy steel headers to eliminate residual stress and prevent stress corrosion cracking. Boyu provides technical support for header condition assessment, remaining life evaluation and replacement planning, helping clients optimize maintenance scheduling and avoid unexpected header failures.

To summarize, the Boiler Header Spare Assembly represents a critical solution for boiler header maintenance and replacement. By delivering prefabricated, code-compliant headers with precise CNC drilling and comprehensive quality documentation, it minimizes boiler downtime, ensures installation reliability and supports long-term boiler safety. Its systematic material selection, rigorous quality control and expert technical support make it an ideal choice for boiler operators planning major maintenance or header replacement. Investing in prefabricated spare headers is a strategic decision that supports long-term boiler availability, safety and regulatory compliance.

Features

·        CNC deep-hole drilling with +/-0.5mm hole position tolerance

·        Prefabricated header reduces on-site installation time by 50-70% vs field fabrication

·        ASME S/U certified, complete MTC, WPS/PQR, PWHT and NDT documentation

·        Systematic material: 20G(<=460C), 15CrMoG(480-520C), 12Cr1MoVG(520-565C)

·        100% UT for header body and all weld joints + 1.5x pressure hydraulic test

·        Full-penetration nozzle welding with automatic robotic systems

·        Direct OEM compatibility per original drawings and nozzle layout

·        Delivery: 20-40 days standard, expedited for critical situations

·        Suitable for superheater, reheater, economizer and water wall headers

·        Expert support for condition assessment and remaining life evaluation

Technical Parameters

Product Name

Boiler Header Spare Assembly

Application

Boiler Header Maintenance & Replacement

Header Material

20G (SA-106 Gr.B) / 15CrMoG (SA-335 P12) / 12Cr1MoVG (P11/P22)

Material Temp Range

<=460C / 480-520C / 520-565C by Location

Header OD

159mm - 426mm

Header WT

16mm - 50mm

Applicable Boiler Pressure

1.6MPa - 25.4MPa (Header up to 29.3MPa)

Drilling Accuracy

+/-0.5mm Hole Position Tolerance

Standard Delivery

20 - 40 Days

NDT

100% UT for Body & Welds + Hydraulic Test

 

Applications

The Boyu Boiler Header Spare Assembly is a critical pressure-bearing replacement component designed for boiler header maintenance and emergency replacement. Manufactured in Shandong, China, this spare header is available in customizable configurations to match diverse OEM boiler designs. Certified with ISO9001, ASME S/U, Grade A, SGS and IBR, the product guarantees high quality, safety and reliability for boiler maintenance applications.

This Header Spare Assembly is widely used in power station boilers, high-pressure industrial boilers, large HRSG waste heat boilers and coking CDQ boilers where header replacement is required during major maintenance or due to end-of-life condition. Its prefabricated design ensures rapid installation and reliable pressure integrity, making it suitable for both planned major overhauls and emergency header failure replacements.

 

Product Highlights

Boiler Header Spare Assembly for Fast Replacement with CNC Deep-Hole Drilling and Full Penetration Welding The Boiler Header Spare Assembly is a critical pressure-bearing replacement component designed for maintenance and emergency replacement of damaged or end-of-life boiler headers in industrial ...

Related Products
Quality Complete Boiler Superheater Integrated Assembly Reheater Economizer Htp Boiler Parts factory

Complete Boiler Superheater Integrated Assembly Reheater Economizer Htp Boiler Parts

Complete Boiler Pressure Parts Integrated Assembly - Superheater, Reheater, Economizer, Water Wall, Header and Drum with Full Customization Boiler Pressure Parts are core pressure-bearing heating surface components of thermal power boilers, industrial steam boilers, biomass boilers and coking waste ...

Quality Vitreous Enamel Coated Steel Boiler Tube Replacement Anti Corrosion Customizable Size factory

Vitreous Enamel Coated Steel Boiler Tube Replacement Anti Corrosion Customizable Size

High-Performance Vitreous Enamel-Coated Steel Tubes for Anti-Corrosion Boiler Heating Surface with Customizable Dimensions The Vitreous Enamel-Coated Steel Tube is a critical anti-corrosion component engineered for low-temperature heating surfaces in industrial boilers, waste heat recovery systems ...

Quality SA213 T11 Alloy Steel Superheater Panel For Boiler Section Customizable Configuration factory

SA213 T11 Alloy Steel Superheater Panel For Boiler Section Customizable Configuration

SA213 T11 Alloy Steel Superheater Panel for High-Temperature Boiler Section with Customizable Configuration The SA213 T11 Alloy Steel Superheater Panel is a high-temperature pressure-bearing heating surface component designed for power station boilers and high-temperature waste heat boilers. ...

Quality Low Temperature Reheater Coil Boiler Pressure Parts For Reheat Systems factory

Low Temperature Reheater Coil Boiler Pressure Parts For Reheat Systems

Low-Temperature Reheater Coil for Industrial and Utility Boiler Reheat Systems with Optimized Gas Flow The Low-Temperature Reheater Coil is a pressure-bearing heating surface component arranged in the low-temperature flue gas zone of industrial and utility boilers to reheat turbine exhaust steam, ...

Request A Quote

Please use our online inquiry contact form below if you have any questions, our team will get back to you as soon as possible.

You can upload up to 5 files and Each file sized 10M max.